The BioAtla project was a 45,000sf buildout that included both office and lab components.  The office portion included creative open ceiling design, conference rooms, break areas, and private offices.  The lab portion included cleanable surfaces throughout, casework, fume hoods, and dedicated power for various lab equipment.
DESIGNER FPBA LOCATION Torrey Pines SQUARE FOOTAGE 45,000 CATEGORY Science

Meet the BioAtla Team

  • Jim Schork

    Project Executive

  • Tracie Riley

    Project Manager

  • Eric Burger

    Vice President of Operations

Sign up for our email list and stay up to date on Burger Construction.